Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption
Top Cited Papers
- 1 April 2015
- journal article
- Published by Elsevier BV in Expert Systems with Applications
- Vol. 42 (5), 2464-2487
- https://doi.org/10.1016/j.eswa.2014.11.016
Abstract
No abstract availableThis publication has 59 references indexed in Scilit:
- Berth allocation considering fuel consumption and vessel emissionsTransportation Research. Part E, Logistics and Transportation Review, 2011
- Developing a dynamic rolling-horizon decision strategy for yard crane schedulingAdvanced Engineering Informatics, 2011
- Integrating berth allocation and quay crane assignmentsTransportation Research. Part E, Logistics and Transportation Review, 2010
- The integrated yard truck and yard crane scheduling problem: Benders’ decomposition-based methodsTransportation Research. Part E, Logistics and Transportation Review, 2010
- An uncertainty-aware AGV assignment algorithm for automated container terminalsTransportation Research. Part E, Logistics and Transportation Review, 2010
- A hybrid parallel genetic algorithm for yard crane schedulingTransportation Research. Part E, Logistics and Transportation Review, 2010
- A heuristic algorithm for yard truck scheduling and storage allocation problemsTransportation Research. Part E, Logistics and Transportation Review, 2009
- Heuristics for the integration of crane productivity in the berth allocation problemTransportation Research. Part E, Logistics and Transportation Review, 2009
- Quay crane scheduling with non-interference constraints in port container terminalsTransportation Research. Part E, Logistics and Transportation Review, 2008
- Yard trailer routing at a maritime container terminalTransportation Research. Part E, Logistics and Transportation Review, 2005