A hybrid parallel genetic algorithm for yard crane scheduling
- 31 January 2010
- journal article
- Published by Elsevier BV in Transportation Research. Part E, Logistics and Transportation Review
- Vol. 46 (1), 136-155
- https://doi.org/10.1016/j.tre.2009.07.002
Abstract
No abstract availableKeywords
This publication has 21 references indexed in Scilit:
- A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminalEuropean Journal of Operational Research, 2007
- Load scheduling for multiple quay cranes in port container terminalsJournal of Intelligent Manufacturing, 2006
- Berth allocation in a container port: using a continuous location space approachTransportation Research Part B: Methodological, 2005
- A crane scheduling method for port container terminalsEuropean Journal of Operational Research, 2004
- Container terminal operation and operations research - a classification and literature reviewOR Spectrum, 2004
- Heuristic algorithms for routing yard‐side equipment for minimizing loading times in container terminalsNaval Research Logistics (NRL), 2003
- A multiple-crane-constrained scheduling problem in a container terminalEuropean Journal of Operational Research, 2003
- Interblock Crane Deployment in Container TerminalsTransportation Science, 2002
- An Optimal Routing Algorithm for a Transfer Crane in Port Container TerminalsTransportation Science, 1999
- The crane scheduling problemTransportation Research Part B: Methodological, 1989