Heuristics for the integration of crane productivity in the berth allocation problem
- 31 January 2009
- journal article
- Published by Elsevier BV in Transportation Research. Part E, Logistics and Transportation Review
- Vol. 45 (1), 196-209
- https://doi.org/10.1016/j.tre.2008.03.001
Abstract
No abstract availableThis publication has 21 references indexed in Scilit:
- The simultaneous berth and quay crane allocation problemTransportation Research. Part E, Logistics and Transportation Review, 2008
- A stochastic beam search for the berth allocation problemDecision Support Systems, 2007
- Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departuresNaval Research Logistics (NRL), 2005
- Integer-Programming Software SystemsAnnals of Operations Research, 2005
- Berth allocation in a container port: using a continuous location space approachTransportation Research Part B: Methodological, 2005
- Crane scheduling with spatial constraintsNaval Research Logistics (NRL), 2004
- Berth scheduling by simulated annealingTransportation Research Part B: Methodological, 2003
- Berth allocation planning in the public berth system by genetic algorithmsEuropean Journal of Operational Research, 2001
- The dynamic berth allocation problem for a container portTransportation Research Part B: Methodological, 2001
- The berth planning problemOperations Research Letters, 1998