Experimental investigation of heuristics for resource-constrained project scheduling: An update
- 1 October 2006
- journal article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 174 (1), 23-37
- https://doi.org/10.1016/j.ejor.2005.01.065
Abstract
No abstract availableKeywords
This publication has 62 references indexed in Scilit:
- A self‐adapting genetic algorithm for project scheduling under resource constraintsNaval Research Logistics (NRL), 2002
- Application of genetic algorithms to construction scheduling with or without resource constraintsCanadian Journal of Civil Engineering, 2002
- Case-based reasoning and improved adaptive search for project schedulingNaval Research Logistics (NRL), 2000
- A simulated annealing algorithm for resource constrained project scheduling problemsJournal of the Operational Research Society, 1997
- An investigation into the relationship of heuristic performance with network-resource characteristicsJournal of the Operational Research Society, 1997
- Efficient priority rules for the resource‐constrained project scheduling problemJournal of Operations Management, 1996
- Search Heuristics for Resource Constrained Project SchedulingJournal of the Operational Research Society, 1996
- Strength and adaptability of problem-space based neighborhoods for resource-constrained schedulingOR Spectrum, 1995
- Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project SchedulingJournal of the Operational Research Society, 1989
- An Experimental Investigation of Resource Allocation in Multiactivity ProjectsJournal of the Operational Research Society, 1973