Efficient priority rules for the resource‐constrained project scheduling problem
- 1 September 1996
- journal article
- Published by Wiley in Journal of Operations Management
- Vol. 14 (3), 179-192
- https://doi.org/10.1016/0272-6963(95)00032-1
Abstract
No abstract availableKeywords
This publication has 39 references indexed in Scilit:
- Strength and adaptability of problem-space based neighborhoods for resource-constrained schedulingOR Spectrum, 1995
- Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project SchedulingJournal of the Operational Research Society, 1989
- Scheduling of project networksAnnals of Operations Research, 1985
- Algorithms for project scheduling with resource constraintsInternational Journal of Production Research, 1982
- Project scheduling: The effects of problem structure on heuristic performanceNaval Research Logistics Quarterly, 1976
- An Experimental Investigation of Resource Allocation in Multiactivity ProjectsJournal of the Operational Research Society, 1973
- Alternate methods of project scheduling with limited resourcesNaval Research Logistics Quarterly, 1973
- On Resource Allocation in Project NetworksJournal of the Operational Research Society, 1972
- Advances in Critical Path MethodsJournal of the Operational Research Society, 1966
- Multiship, multishop, workload‐smoothing progfumNaval Research Logistics Quarterly, 1962