A multiple-crane-constrained scheduling problem in a container terminal
- 1 January 2003
- journal article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 144 (1), 83-107
- https://doi.org/10.1016/s0377-2217(01)00382-4
Abstract
No abstract availableKeywords
This publication has 9 references indexed in Scilit:
- Analysis of a new vehicle scheduling and location problemNaval Research Logistics (NRL), 2001
- Parallel machine scheduling with a common serverDiscrete Applied Mathematics, 2000
- A Survey of Optimization Models for Train Routing and SchedulingTransportation Science, 1998
- A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMSOperations Research, 1995
- A review of research on AGVS vehicle managementEngineering Costs and Production Economics, 1991
- A review of automated guided-vehicle systems design and schedulingProduction Planning & Control, 1991
- A branch and bound solution method for the crane scheduling problemTransportation Research Part B: Methodological, 1990
- The crane scheduling problemTransportation Research Part B: Methodological, 1989
- Review of operator/machine interference modelsInternational Journal of Production Research, 1985