Optimizing mining complexes with multiple processing and transportation alternatives: An uncertainty-based approach
Top Cited Papers
Open Access
- 1 November 2015
- journal article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 247 (1), 166-178
- https://doi.org/10.1016/j.ejor.2015.05.002
Abstract
No abstract availableKeywords
Funding Information
- Natural Sciences and Engineering Research Council of Canada (CRDPJ 411270-10)
- Canada Research Chairs
- BHP Billiton (239019)
This publication has 13 references indexed in Scilit:
- A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertaintyJournal of the Operational Research Society, 2014
- Stochastic mine production scheduling with multiple processes: Application at Escondida Norte, ChileJournal of Mining Science, 2013
- Joint stochastic optimisation of short and long term mine production planning: method and application in a large operating gold mineMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2013
- Algorithmic integration of geological uncertainty in pushback designs for complex multiprocess open pit minesMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2013
- Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertaintyJournal of Mining Science, 2013
- A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertaintyEuropean Journal of Operational Research, 2012
- Production scheduling with uncertain supply: a new solution to the open pit mining problemOptimization and Engineering, 2012
- Recovery vs. mass pull: The link to air recoveryMinerals Engineering, 2010
- Stochastic optimisation model for open pit mine planning: application and risk analysis at copper depositMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2007
- Optimization by Simulated AnnealingScience, 1983