A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
Open Access
- 1 November 2012
- journal article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 222 (3), 642-652
- https://doi.org/10.1016/j.ejor.2012.05.029
Abstract
No abstract availableKeywords
Funding Information
- NSERC (335696)
- NSERC Discovery (239019)
This publication has 16 references indexed in Scilit:
- A strengthened formulation and cutting planes for the open pit mine production scheduling problemComputers & Operations Research, 2010
- Large-scale multi-period precedence constrained knapsack problem: A mining applicationElectronic Notes in Discrete Mathematics, 2010
- Algorithmic approach to pushback design based on stochastic programming: method, application and comparisonsMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2010
- Direct Sequential Co-simulation with Joint Probability DistributionsMathematical Geosciences, 2010
- Block Simulation of Multiple Correlated VariablesMathematical Geosciences, 2008
- TTT plots: a perl program to create time-to-target plotsOptimization Letters, 2006
- An Application of Branch and Cut to Open Pit Mine SchedulingJournal of Global Optimization, 2003
- Variable neighborhood search: Principles and applicationsEuropean Journal of Operational Research, 2001
- A Tabu Search Heuristic for the Vehicle Routing ProblemManagement Science, 1994
- Heuristic approaches for mine planning and production schedulingGeotechnical and Geological Engineering, 1987