Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
- 30 November 2005
- journal article
- Published by Wiley in Naval Research Logistics (NRL)
- Vol. 53 (1), 60-74
- https://doi.org/10.1002/nav.20108
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- A decision support system for operations in a container terminalDecision Support Systems, 2005
- A multiprocessor task scheduling model for berth allocation: heuristic and worst-case analysisOperations Research Letters, 2002
- Berth planning and resources optimisation at a container terminal via discrete event simulationEuropean Journal of Operational Research, 2001
- Berth allocation planning in the public berth system by genetic algorithmsEuropean Journal of Operational Research, 2001
- The dynamic berth allocation problem for a container portTransportation Research Part B: Methodological, 2001
- Efficient planning of berth allocation for container terminals in AsiaJournal of Advanced Transportation, 1997
- A study of container berth allocationJournal of Advanced Transportation, 1992
- A branch and bound solution method for the crane scheduling problemTransportation Research Part B: Methodological, 1990
- The crane scheduling problemTransportation Research Part B: Methodological, 1989
- Complexity of Machine Scheduling ProblemsPublished by Elsevier BV ,1977