A two-phase GA model for resource-constrained project scheduling
- 31 July 2009
- journal article
- Published by Elsevier BV in Automation in Construction
- Vol. 18 (4), 485-498
- https://doi.org/10.1016/j.autcon.2008.11.003
Abstract
No abstract availableKeywords
This publication has 13 references indexed in Scilit:
- A GA-based fuzzy optimal model for construction time–cost trade-offInternational Journal of Project Management, 2001
- Object-oriented resource-based planning method (ORPM) for constructionInternational Journal of Project Management, 2000
- Scheduling/Cost Optimization and Neural Dynamics Model for ConstructionJournal of Construction Engineering and Management, 1997
- Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off ProblemsJournal of Computing in Civil Engineering, 1997
- Construction Resource Scheduling with Genetic AlgorithmsJournal of Construction Engineering and Management, 1996
- The LP/IP hybrid method for construction time-cost trade-off analysisConstruction Management and Economics, 1996
- Schedule compression using the direct stiffness methodCanadian Journal of Civil Engineering, 1993
- Resource allocation via dynamic programming in activity networksEuropean Journal of Operational Research, 1993
- An Algorithm for Optimal Project Scheduling under Multiple Resource ConstraintsManagement Science, 1971
- Multiproject Scheduling with Limited Resources: A Zero-One Programming ApproachManagement Science, 1969