A GA-based fuzzy optimal model for construction time–cost trade-off
- 1 January 2001
- journal article
- Published by Elsevier BV in International Journal of Project Management
- Vol. 19 (1), 47-58
- https://doi.org/10.1016/s0263-7863(99)00035-6
Abstract
No abstract availableThis publication has 18 references indexed in Scilit:
- A TIME-COST TRADE-OFF MODEL WITH RESOURCE CONSIDERATION USING GENETIC ALGORITHMCivil Engineering Systems, 1997
- Project-Network Analysis Using Fuzzy Sets TheoryJournal of Construction Engineering and Management, 1996
- Fuzzy priority heuristics for project schedulingFuzzy Sets and Systems, 1996
- Using PERT as an approximation of fuzzy project-network analysisIEEE Transactions on Engineering Management, 1993
- Nondeterministic Networking MethodsJournal of Construction Engineering and Management, 1993
- Angular fuzzy set models for linguistic valuesCivil Engineering Systems, 1990
- Risk Evaluation in Resource AllocationJournal of Construction Engineering and Management, 1984
- Project Scheduling Using Fuzzy Set ConceptsJournal of Construction Engineering and Management, 1984
- The use of fuzzy variables in pertFuzzy Sets and Systems, 1981
- Dynamic Programming for Project Cost-Time CurvesJournal of the Construction Division, 1967