Routing and scheduling in a flexible job shop by tabu search
- 1 September 1993
- journal article
- Published by Springer Science and Business Media LLC in Annals of Operations Research
- Vol. 41 (3), 157-183
- https://doi.org/10.1007/bf02023073
Abstract
No abstract availableThis publication has 33 references indexed in Scilit:
- Factory Level Aggregate Scheduling: A Basis For A Hierarchical ApproachPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2005
- A genetic algorithm for job shopPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- Tabu Search—Part IIINFORMS Journal on Computing, 1990
- Hybrid hierarchical scheduling and control systems in manufacturingIEEE Transactions on Robotics and Automation, 1990
- A bottleneck-based beam search for job scheduling in a flexible manufacturing systemInternational Journal of Production Research, 1989
- Tabu Search—Part IINFORMS Journal on Computing, 1989
- An inexact algorithm for part input sequencing and scheduling with side constraints in FMSInternational Journal of Flexible Manufacturing Systems, 1989
- The Shifting Bottleneck Procedure for Job Shop SchedulingManagement Science, 1988
- Performance of Hierarchical Production Scheduling PolicyIEEE Transactions on Components, Hybrids, and Manufacturing Technology, 1984
- Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration AlgorithmOperations Research, 1969