Factory Level Aggregate Scheduling: A Basis For A Hierarchical Approach
- 24 August 2005
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 413-422
- https://doi.org/10.1109/cim.1992.639142
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Near optimal manufacturing flow controller designInternational Journal of Flexible Manufacturing Systems, 1991
- Branch and bound algorithm for the flow shop with multiple processorsEuropean Journal of Operational Research, 1991
- Modelling and scheduling of a flexible manufacturing systemEuropean Journal of Operational Research, 1990
- Multi-level production scheduling for a class of flexible machining and assembly systemsAnnals of Operations Research, 1989
- Sequencing in an Assembly Line with Blocking to Minimize Cycle TimeOperations Research, 1989
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production SystemsManagement Science, 1989
- DOPP—dynamically optimized production planning†International Journal of Production Research, 1988
- Filtered beam search in scheduling†International Journal of Production Research, 1988
- Preemptive Scheduling of Uniform Machines by Ordinary Network Flow TechniquesManagement Science, 1986
- Scheduling algorithms for flexible flow linesIBM Journal of Research and Development, 1985