Resource-Constrained Scheduling of Parallel Production Lines Using Asynchronous Slots
- 7 November 2003
- journal article
- research article
- Published by American Chemical Society (ACS) in Industrial & Engineering Chemistry Research
- Vol. 42 (26), 6832-6842
- https://doi.org/10.1021/ie030341w
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- An Improved MILP Formulation for Scheduling Multiproduct, Multistage Batch PlantsIndustrial & Engineering Chemistry Research, 2003
- A Slot-Based Formulation for Single-Stage Multiproduct Batch Plants with Multiple Orders per ProductIndustrial & Engineering Chemistry Research, 2003
- Scheduling Parallel Production Lines with Resource Constraints. 2. Decomposition AlgorithmIndustrial & Engineering Chemistry Research, 2002
- Scheduling Parallel Production Lines with Resource Constraints. 1. Model FormulationIndustrial & Engineering Chemistry Research, 2002
- Optimal scheduling of batch plants satisfying multiple product orders with different due-datesComputers & Chemical Engineering, 2000
- Effective Continuous-Time Formulation for Short-Term Scheduling. 3. Multiple Intermediate Due DatesIndustrial & Engineering Chemistry Research, 1999
- Effective Continuous-Time Formulation for Short-Term Scheduling. 2. Continuous and Semicontinuous ProcessesIndustrial & Engineering Chemistry Research, 1998
- A Mixed-Integer Linear Programming Model for Short-Term Scheduling of Single-Stage Multiproduct Batch Plants with Parallel LinesIndustrial & Engineering Chemistry Research, 1997
- Scheduling of multipurpose batch chemical plants with resource constraintsIndustrial & Engineering Chemistry Research, 1993
- MINLP model for cyclic multiproduct scheduling on continuous parallel linesComputers & Chemical Engineering, 1991