MINLP model for cyclic multiproduct scheduling on continuous parallel lines
- 28 February 1991
- journal article
- Published by Elsevier BV in Computers & Chemical Engineering
- Vol. 15 (2), 85-103
- https://doi.org/10.1016/0098-1354(91)87008-w
Abstract
No abstract availableThis publication has 22 references indexed in Scilit:
- Economic Lot Scheduling for Multiple Products on Parallel Identical ProcessorsManagement Science, 1990
- A more efficient formulation of the single machine, static demand, lot scheduling problemEngineering Costs and Production Economics, 1988
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot SizesOperations Research, 1987
- An outer-approximation algorithm for a class of mixed-integer nonlinear programsMathematical Programming, 1986
- Branch and Bound Methods for Mathematical Programming SystemsAnnals of Discrete Mathematics, 1979
- The Economic Lot Scheduling Problem (ELSP): Review and ExtensionsManagement Science, 1978
- Lot Sizing and Sequencing for N Products on One FacilityManagement Science, 1977
- An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling ProblemManagement Science, 1973
- A Dynamic Programming Approach to a Lot Size Scheduling ProblemManagement Science, 1966
- Algorithm 97: Shortest pathCommunications of the ACM, 1962