A fast technique for unit commitment problem by extended priority list
Top Cited Papers
- 13 May 2003
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 18 (2), 882-888
- https://doi.org/10.1109/tpwrs.2003.811000
Abstract
This paper introduces a new unit commitment problem, adapting extended priority list (EPL) method. The EPL method consists of two steps, in the first step we get rapidly some initial unit commitment problem schedules by priority list (PL) method. At this step, operational constraints are disregarded. In the second step unit schedule is modified using the problem specific heuristics to fulfill operational constraints. To calculate efficiently, however, note that some heuristics applied only to solutions can expect improvement. Several numerical examples demonstrate the effectiveness of proposed method.Keywords
This publication has 6 references indexed in Scilit:
- A fast solution technique for large scale unit commitment problem using genetic algorithmPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2003
- An evolutionary programming solution to the unit commitment problemIEEE Transactions on Power Systems, 1999
- Short-term resource scheduling with ramp constraints [power generation scheduling]IEEE Transactions on Power Systems, 1997
- A genetic algorithm solution to the unit commitment problemIEEE Transactions on Power Systems, 1996
- Solution of Large-Scale Optimal Unit Commitment ProblemsIEEE Transactions on Power Apparatus and Systems, 1982
- Large Scale Hydro-Thermal Unit Commitment-Method and ResultsIEEE Transactions on Power Apparatus and Systems, 1971