Use of GI/G/1 queuing approximations to set tactical parameters for the simulation of MRP systems
- 25 June 2003
- conference paper
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Abstract
No abstract availableThis publication has 6 references indexed in Scilit:
- MRP performance effects due to forecast bias and demand uncertaintyEuropean Journal of Operational Research, 2002
- MRP performance effects due to lot size and planned lead time settingsInternational Journal of Production Research, 2001
- ACLIPS: A Capacity and Lead Time Integrated Procedure for SchedulingManagement Science, 1998
- A general approximation for the single product lot sizing model with queueing delaysEuropean Journal of Operational Research, 1996
- A Model for Determining Tactical Parameters for Materials Requirements Planning SystemsJournal of the Operational Research Society, 1992
- The Queueing Network AnalyzerBell System Technical Journal, 1983