Concurrent Construction and Life Cycle Project Management
- 1 December 1997
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 123 (4), 427-436
- https://doi.org/10.1061/(asce)0733-9364(1997)123:4(427)
Abstract
This paper investigates “concurrent construction” and its potential application in life cycle management of capital projects. The construction industry is under pressure to reduce project delivery times and costs despite increased uncertainties, ambiguities, and complexities that surround today's projects. Concurrent construction may well hold the key to success on this front. Concurrent construction is based on integrating all project phases into a single phase. It starts with the definition of a product model and division of the project into major parts or systems accordingly. Each part or system is entrusted to a team consisting of members drawn from the relevant disciplines as well as the contractor. The delivery of a specific part is carried out by the relevant team in an integrated fashion in a single phase. While the potential benefits of concurrent construction are beyond doubt, current contractual, organizational, and work method barriers militate against realizing these. However, there are workable solutions to these problems. This paper covers examples of approaches that could overcome these barriers.Keywords
This publication has 6 references indexed in Scilit:
- Time and priority allocation scheduling technique for projectsInternational Journal of Project Management, 1996
- Simultaneous management: The key to excellence in capital projectsInternational Journal of Project Management, 1996
- Twinning Time and Cost in Incentive-Based ContractsJournal of Management in Engineering, 1996
- Empowering the construction project teamInternational Journal of Project Management, 1996
- EditorialInternational Journal of Project Management, 1996
- DICE: An Object Oriented Programming Environment for Cooperative Engineering DesignPublished by Defense Technical Information Center (DTIC) ,1989