Assessment of the bolt-grout interface behaviour of fully grouted rockbolts from laboratory experiments under axial loads
- 1 October 2013
- journal article
- Published by Elsevier BV in International Journal of Rock Mechanics and Mining Sciences
- Vol. 63, 50-61
- https://doi.org/10.1016/j.ijrmms.2013.06.007
Abstract
No abstract availableKeywords
Funding Information
- European Union Research Fund for Coal and Steel (PROSAFECOAL project)
- French Public Agency in Charge of the Management of Radioactive Waste (Andra, MIBOULAND project)
This publication has 12 references indexed in Scilit:
- A new analytical solution to the mechanical behaviour of fully grouted rockbolts subjected to pull-out testsConstruction and Building Materials, 2010
- An analytical analysis of the full-range behaviour of grouted rockbolts based on a tri-linear bond-slip modelConstruction and Building Materials, 2009
- Cyclic bond behaviour of plain bars. Part I: Experimental investigationConstruction and Building Materials, 2009
- Bond of cement grouted reinforcing bars under constant radial pressureCement and Concrete Composites, 2005
- Laboratory evaluation of cement-based grouts and grouted rock anchorsInternational Journal of Rock Mechanics and Mining Sciences, 1995
- A constitutive law for bond failure of fully-grouted cable bolts using a modified hoek cellInternational Journal of Rock Mechanics and Mining Sciences, 1995
- Effect of stress change on the bond strength of fully grouted cablesInternational Journal of Rock Mechanics and Mining Sciences, 1992
- Bond strength of grouted cable boltsInternational Journal of Rock Mechanics and Mining Sciences, 1992
- Modelling rock joints under shear and normal loadingInternational Journal of Rock Mechanics and Mining Sciences, 1992
- Stress distribution along a resin grouted rock anchorInternational Journal of Rock Mechanics and Mining Sciences, 1975