Quantification of social costs associated with construction projects: state-of-the-art review
- 31 January 2005
- journal article
- Published by Elsevier BV in Tunnelling and Underground Space Technology
- Vol. 20 (1), 89-104
- https://doi.org/10.1016/j.tust.2004.04.003
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Case Study - Crystal Beach, City of Ottawa: Two Watermain Rehabilitation Techniques on One Project - City of OttawaPublished by American Society of Civil Engineers (ASCE) ,2002
- Rehabilitation of Water Mains in Hong KongPublished by American Society of Civil Engineers (ASCE) ,2002
- User cost savings in eliminating pavement excavations through employing trenchless technologiesCanadian Journal of Civil Engineering, 2002
- Construction noise control program and mitigation strategy at the Central Artery/Tunnel ProjectNoise Control Engineering Journal, 2000
- Traffic Delay Cost Savings Associated with Trenchless TechnologyJournal of Infrastructure Systems, 1999
- Roads and the environmentPublished by World Bank ,1997
- Bidding strategies for conventional and trenchless technologies considering social costsCanadian Journal of Civil Engineering, 1997
- A+B Bidding Method—Hidden Success Story for Highway ConstructionJournal of Construction Engineering and Management, 1995
- Average‐Bid Method—Competitive Bidding StrategyJournal of Construction Engineering and Management, 1993
- Multiparameter Bidding System—Innovation in Contract AdministrationJournal of Construction Engineering and Management, 1992