A probabilistic approach for safety risk analysis in metro construction
- 1 March 2014
- journal article
- Published by Elsevier BV in Safety Science
- Vol. 63, 8-17
- https://doi.org/10.1016/j.ssci.2013.10.016
Abstract
No abstract availableThis publication has 25 references indexed in Scilit:
- Development of web-based system for safety risk early warning in urban metro constructionAutomation in Construction, 2013
- Safety risk identification system for metro construction on the basis of construction drawingsAutomation in Construction, 2012
- Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree AnalysisJournal of Construction Engineering and Management, 2011
- Fuzzy fault tree analysis: revisitedInternational Journal of System Assurance Engineering and Management, 2011
- Fault and Event Tree Analyses for Process Systems Risk Analysis: Uncertainty Handling FormulationsRisk Analysis, 2010
- Weighted trapezoidal approximation-preserving cores of a fuzzy numberComputers & Mathematics with Applications, 2010
- Methodology for computer aided fuzzy fault tree analysisProcess Safety and Environmental Protection, 2009
- Fuzzy risk analysis based on the ranking of generalized trapezoidal fuzzy numbersApplied Intelligence, 2006
- Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2Tunnelling and Underground Space Technology, 2004
- The effectiveness of working group risk identification and assessment techniquesInternational Journal of Project Management, 1998