Analysis on Risk Factors of BIM Application in Construction Project Operation and Maintenance Phase
Open Access
- 1 January 2021
- journal article
- research article
- Published by Scientific Research Publishing, Inc. in Journal of Service Science and Management
- Vol. 14 (02), 213-227
- https://doi.org/10.4236/jssm.2021.142013
Abstract
There are various risk factors in the application of BIM. The reasonable management of risk factors can avoid unnecessary cost losses. Based on a large amount of literature, the article combed out the 17 risk factors that existed in the operation and maintenance phase, and revised it through expert interview method, and then obtained 11 risk factors. Semi-structured interviews were used to investigate the relationship between risk factors, and established Interpretative Structural Modeling (ISM) to analyze the hierarchical relationship of risk factors, and got two surface risk factors, five middle risk factors, and four deep risk factors. Finally, relevant improvement suggestions are put forward to eliminate or reduce the risk of using BIM in the operation and maintenance phase.Keywords
This publication has 3 references indexed in Scilit:
- Identifying and assessing critical risk factors for BIM projects: Empirical studyAutomation in Construction, 2014
- Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologiesApplied Soft Computing, 2014
- Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC IndustryLeadership and Management in Engineering, 2011