Equivalent pile load–head settlement curve using a bi-directional pile load test
- 1 March 2008
- journal article
- Published by Elsevier BV in Computers and Geotechnics
- Vol. 35 (2), 124-133
- https://doi.org/10.1016/j.compgeo.2007.06.008
Abstract
No abstract availableThis publication has 5 references indexed in Scilit:
- Numerical Analysis of Drilled Shaft O-Cell Testing in Mica SchistPublished by American Society of Civil Engineers (ASCE) ,2004
- Osterberg Load Cell Test Results on Base Grouted Bored Piles in BangladeshPublished by American Society of Civil Engineers (ASCE) ,2004
- Capacity of Drilled Shafts in Burlington LimestoneJournal of Geotechnical and Geoenvironmental Engineering, 2002
- O-Cell Test Results for Drilled Shafts in Marl and LimestonePublished by American Society of Civil Engineers (ASCE) ,2002
- O-Cell Testing and FE Analysis of 28-m-Deep Barrette in Manila, PhilippinesJournal of Geotechnical and Geoenvironmental Engineering, 1999