MRP in a job shop environment using a resource constrained project scheduling model
- 31 August 2002
- journal article
- Published by Elsevier BV in Omega
- Vol. 30 (4), 275-286
- https://doi.org/10.1016/s0305-0483(02)00033-6
Abstract
No abstract availableKeywords
This publication has 16 references indexed in Scilit:
- Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedureIIE Transactions, 2000
- A capacity-constrained multi-level inventory and production control problemInternational Journal of Production Economics, 1996
- MRP systems under supply and process uncertainty in an integrated shop floor control environmentInternational Journal of Production Research, 1995
- Project Scheduling Problems: A SurveyInternational Journal of Operations & Production Management, 1993
- A New Framework for Manufacturing Planning and Control Systems*Decision Sciences, 1993
- AN ANALYSIS AND DISCUSSION OF THE OPTIMIZED PRODUCTION TECHNOLOGY SOFTWARE AND ITS USEProduction and Operations Management, 1992
- Kanban, MRP, and Shaping the Manufacturing EnvironmentManagement Science, 1987
- A heuristic algorithm for capacity sensitive requirements planningJournal of Operations Management, 1985
- AN ANALYSIS OF CAPACITY PLANNING PROCEDURES FOR A MATERIAL REQUIREMENTS PLANNING SYSTEM*Decision Sciences, 1984
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem ReductionManagement Science, 1983