Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption
Top Cited Papers
Open Access
- 1 February 2016
- journal article
- research article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 248 (3), 772-788
- https://doi.org/10.1016/j.ejor.2015.08.064
Abstract
No abstract availableKeywords
This publication has 52 references indexed in Scilit:
- Modeling and prediction of machining quality in CNC turning process using intelligent hybrid decision making toolsApplied Soft Computing, 2013
- Minimizing fuel emissions by optimizing vessel schedules in liner shipping with uncertain port timesTransportation Research. Part E, Logistics and Transportation Review, 2012
- Hybrid flowshop scheduling with machine and resource-dependent processing timesApplied Mathematical Modelling, 2011
- Lot sizing and scheduling: industrial extensions and research opportunitiesInternational Journal of Production Research, 2011
- Using Frontier Portfolios to Improve Make‐to‐Order OperationsProduction and Operations Management, 2009
- A hybrid approach to large-scale job shop schedulingApplied Intelligence, 2008
- A framework to minimise total energy consumption and total tardiness on a single machineInternational Journal of Sustainable Engineering, 2008
- Operational methods for minimization of energy consumption of manufacturing equipmentInternational Journal of Production Research, 2007
- Quantity Discount‐Based Inventory Coordination: Effectiveness and Critical Environmental FactorsProduction and Operations Management, 2004
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954