Optimal cyclic scheduling of multistage continuous multiproduct plants
- 30 September 1994
- journal article
- Published by Elsevier BV in Computers & Chemical Engineering
- Vol. 18 (9), 797-816
- https://doi.org/10.1016/0098-1354(93)e0021-z
Abstract
No abstract availableThis publication has 14 references indexed in Scilit:
- Production planning for the rational use of energy in multiproduct continuous plantsComputers & Chemical Engineering, 1993
- Targeting strategies for the synthesis and energy integration of nonisothermal reactor networksIndustrial & Engineering Chemistry Research, 1992
- Optimal Manufacturing of a Two Product MixOperations Research, 1991
- A Strong Cutting Plane Algorithm for Production Scheduling with Changeover CostsOperations Research, 1990
- Computational experience with dicopt solving MINLP problems in process systems engineeringComputers & Chemical Engineering, 1989
- An outer-approximation algorithm for a class of mixed-integer nonlinear programsMathematical Programming, 1986
- Simultaneous optimization and heat integration of chemical processesAIChE Journal, 1986
- One‐ and two‐stage scheduling of two products with distributed inserted idle time: The benefits of a controllable production rateNaval Research Logistics Quarterly, 1983
- The Economic Lot Scheduling Problem (ELSP): Review and ExtensionsManagement Science, 1978
- Generalized Benders decompositionJournal of Optimization Theory and Applications, 1972