Lot sizing and scheduling — Survey and extensions
- 1 June 1997
- journal article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 99 (2), 221-235
- https://doi.org/10.1016/s0377-2217(97)00030-1
Abstract
No abstract availableThis publication has 92 references indexed in Scilit:
- Minimizing the error bound for the dynamic lot size modelOperations Research Letters, 1995
- DLSP for two-stage multi-item batch productionInternational Journal of Production Research, 1994
- Statistical search methods for lotsizing problemsAnnals of Operations Research, 1993
- LINEAR PROGRAMMING, SIMULATED ANNEALING AND TABU SEARCH HEURISTICS FOR LOTSIZING IN BOTTLENECK ASSEMBLY SYSTEMSIIE Transactions, 1993
- USING SHORT‐TERM DEDICATION FOR SCHEDULING MULTIPLE PRODUCTS ON PARALLEL MACHINESProduction and Operations Management, 1992
- Error bound for the dynamic lot size model with backloggingAnnals of Operations Research, 1991
- Capacitated dynamic lotsizing heuristics for serial systemsInternational Journal of Production Research, 1991
- An Improved Heuristic for Multilevel Lot Sizing in Material Requirements PlanningDecision Sciences, 1991
- A Mixed Integer Programming Model for Lot Sizing and Sequencing Packaging Lines in the Process IndustriesIIE Transactions, 1986
- Multi-stage lot sizing in a serial production systemInternational Journal of Production Research, 1986