Settlement and slaking problems in the world's fourth largest rock-fill dam, the Ataturk Dam in Turkey
- 1 May 2000
- journal article
- Published by Elsevier BV in Engineering Geology
- Vol. 56 (3-4), 225-242
- https://doi.org/10.1016/s0013-7952(99)00049-6
Abstract
No abstract availableThis publication has 4 references indexed in Scilit:
- The geological problems of the large dams constructed on the Euphrates River (Turkey)Engineering Geology, 1999
- How did the Meers fault scarp form? Paleoearthquake or aseismic creep?Engineering Geology, 1997
- Rock weathering in engineering timeQuarterly Journal of Engineering Geology, 1988
- The slake-durability testInternational Journal of Rock Mechanics and Mining Sciences, 1972