Performance of fully encapsulated rebar bolts and D-Bolts under combined pull-and-shear loading
- 1 January 2015
- journal article
- Published by Elsevier BV in Tunnelling and Underground Space Technology
- Vol. 45, 99-106
- https://doi.org/10.1016/j.tust.2014.09.008
Abstract
No abstract availableKeywords
This publication has 16 references indexed in Scilit:
- Performance of D-bolts Under Static LoadingRock Mechanics and Rock Engineering, 2011
- Tunnel reinforcement with rockboltsTunnelling and Underground Space Technology, 2011
- A new energy-absorbing bolt for rock support in high stress rock massesInternational Journal of Rock Mechanics and Mining Sciences, 2010
- Analytical and Numerical Study of the Mechanics of Rockbolt Reinforcement around Tunnels in Rock MassesRock Mechanics and Rock Engineering, 2009
- Analytical Behaviour of Bolt–Joint Intersection Under Lateral Loading ConditionsRock Mechanics and Rock Engineering, 2009
- The effect of surface profile, rock strength and pretension load on bending behaviour of fully grouted boltsGeotechnical and Geological Engineering, 2006
- 3D Behaviour of bolted rock joints: experimental and numerical studyInternational Journal of Rock Mechanics and Mining Sciences, 2005
- A study of rock bolting design in soft rockInternational Journal of Rock Mechanics and Mining Sciences, 2004
- Analytical model for the design of grouted rock boltsInternational Journal for Numerical and Analytical Methods in Geomechanics, 1990
- Stress distribution along a resin grouted rock anchorInternational Journal of Rock Mechanics and Mining Sciences, 1975