A survey of current cost estimating practices in the UK
- 1 March 2000
- journal article
- research article
- Published by Informa UK Limited in Construction Management and Economics
- Vol. 18 (2), 161-172
- https://doi.org/10.1080/014461900370799
Abstract
The results are documented of an investigation into current cost estimating practices of contractors for construction projects. A questionnaire survey of contractors was undertaken, in which the respondents are classified into four groups based on their turnover namely: very small, small, medium and large firms. The survey indicates that contractors, irrespective of size, continue to undertake cost estimating predominantly for construction planning purposes, including the preparation of tenders and cost control of projects during the execution stage and, to a lesser extent, for construction project evaluation. Recent developments in cost estimating methods and tools that consider risks and variability in cost estimates, such as the use of range estimating and parametric estimating techniques, have not been adopted by contractors. The practice of cost estimating does not differ from conventional techniques based on the use of labour and material constants to obtain prices for bills of quantities items on an item by item basis. The study shows that the major causes of inaccuracy in cost estimating continue to be the lack of practical knowledge of the construction process by those responsible for the estimating function, insufficient time to prepare cost estimates, poor tender documentation and the wide variability of subcontractors' prices.Keywords
This publication has 15 references indexed in Scilit:
- Risk analysis and management in constructionInternational Journal of Project Management, 1997
- Do site managers and the head office perceive productivity factors differently?Engineering, Construction and Architectural Management, 1996
- Building Construction Detailed Estimating Practices in Saudi ArabiaJournal of Construction Engineering and Management, 1994
- Factors considered in tendering decisions by top UK contractorsConstruction Management and Economics, 1993
- Information systems software cost estimating: a current assessmentJournal of Information Technology, 1993
- Cost‐Estimating PrinciplesJournal of Construction Engineering and Management, 1989
- Tendering: optimization and rationalityConstruction Management and Economics, 1989
- Design analysis through techniques of parametric cost estimationEngineering Costs and Production Economics, 1988
- Performance appraisal revisitedOrganizational Dynamics, 1984
- Improved factor estimating with quantity and manhour ratiosEngineering and Process Economics, 1977