Resolving uncertainty in manufacturing systems
- 1 August 1984
- journal article
- Published by Wiley in Journal of Operations Management
- Vol. 4 (4), 331-345
- https://doi.org/10.1016/0272-6963(84)90020-2
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Aggregate Safety Stock Levels and Component Part CommonalityManagement Science, 1982
- Capacity planning techniques for manufacturing control systems: Information requirements and operational featuresJournal of Operations Management, 1982
- An investigation of due‐date assignment rules with constrained tightnessJournal of Operations Management, 1981
- Simultaneous Statistical InferenceSpringer Series in Statistics, 1981
- THE MEASUREMENT AND OPERATING BENEFITS OF COMPONENT PART COMMONALITYDecision Sciences, 1981
- Priority dispatching rules in job shops with assembly operations and random delaysOmega, 1980
- A Simulation Study of Predictable Due-DatesManagement Science, 1979
- An Analytic Framework for Evaluating Rolling SchedulesManagement Science, 1979
- Toyota production system and Kanban system Materialization of just-in-time and respect-for-human systemInternational Journal of Production Research, 1977
- MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTYDecision Sciences, 1976