Integrated scheduling of crane handling and truck transportation in a maritime container terminal
- 1 February 2013
- journal article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 225 (1), 142-152
- https://doi.org/10.1016/j.ejor.2012.09.019
Abstract
No abstract availableThis publication has 35 references indexed in Scilit:
- Integrated quay crane and yard truck schedule problem in container terminalsTsinghua Science and Technology, 2010
- The integrated yard truck and yard crane scheduling problem: Benders’ decomposition-based methodsTransportation Research. Part E, Logistics and Transportation Review, 2010
- Optimization of container process at seaport terminalsJournal of the Operational Research Society, 2010
- A dispatching method for automated lifting vehicles in automated port container terminalsComputers & Industrial Engineering, 2009
- Quay crane scheduling with non-interference constraints in port container terminalsTransportation Research. Part E, Logistics and Transportation Review, 2008
- Scheduling trucks in container terminals using a genetic algorithmEngineering Optimization, 2007
- Quay crane scheduling in container terminalsEngineering Optimization, 2006
- Yard crane scheduling in port container terminalsApplied Mathematical Modelling, 2005
- Genetic algorithms to schedule container transfers at multimodal terminalsInternational Transactions in Operational Research, 1999
- Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assembliesInternational Journal of Production Research, 1998