Short‐Term Hydroscheduling with Discrepant Objectives Using Multi‐Step Progressive Optimality Algorithm1
- 2 February 2012
- journal article
- Published by Wiley in Jawra Journal of the American Water Resources Association
- Vol. 48 (3), 464-479
- https://doi.org/10.1111/j.1752-1688.2011.00628.x
Abstract
No abstract availableKeywords
This publication has 28 references indexed in Scilit:
- Hydro energy systems management in Portugal: Profit-based evaluation of a mixed-integer nonlinear approachEnergy, 2011
- Optimal Scheduling of a Price-Taker Cascaded Reservoir System in a Pool-Based Electricity MarketIEEE Transactions on Power Systems, 2010
- Scheduling of Head-Sensitive Cascaded Hydro Systems: A Nonlinear ApproachIEEE Transactions on Power Systems, 2008
- Short-term hydrothermal generation scheduling model using a genetic algorithmIEEE Transactions on Power Systems, 2003
- Optimization of Large-Scale Hydropower System OperationsJournal of Water Resources Planning and Management, 2003
- Piece-by-Piece Approach to Solving Large Nonlinear Water Resources Management ModelsJournal of Water Resources Planning and Management, 2001
- MULTIOBJECTIVE REAL‐TIME RESERVOIR OPERATION WITH A NETWORK FLOW ALGORITHM1Jawra Journal of the American Water Resources Association, 2001
- MULTIOBJECTWE OPTIMIZATION OF RESERVOIR SYSTEMS OPERATION1Jawra Journal of the American Water Resources Association, 1992
- A NONLINEAR PROGRAMMING ALGORITHM FOR REAL‐TIME HOURLY RESERVOIR OPERATIONS1Jawra Journal of the American Water Resources Association, 1978
- A new algorithm for the solution of multi-state dynamic programming problemsMathematical Programming, 1975