Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory
- 1 October 2005
- journal article
- Published by Springer Science and Business Media LLC in Journal of Intelligent Manufacturing
- Vol. 16 (4-5), 549-557
- https://doi.org/10.1007/s10845-005-1663-4
Abstract
No abstract availableKeywords
This publication has 16 references indexed in Scilit:
- A bottleneck-based due-date assignment methodologyInternational Journal of Manufacturing Technology and Management, 2000
- Similarity measures for retrieval in case-based reasoning systemsApplied Artificial Intelligence, 1998
- A comparison study of selected training algorithms for neural networks with regard to classification of remotely sensed multispectral imagesAdvances in Space Research, 1998
- The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factoriesIEEE Transactions on Components, Packaging, and Manufacturing Technology: Part C, 1997
- Job shop flowtime prediction and tardiness control using queueing analysisInternational Journal of Production Research, 1993
- Generating fuzzy rules by learning from examplesIEEE Transactions on Systems, Man, and Cybernetics, 1992
- Dynamic rules for due-date assignmentInternational Journal of Production Research, 1991
- Multilayer feedforward networks are universal approximatorsNeural Networks, 1989
- Estimating Job Flow-Times in a Job Shop for Contractually Negotiated Due-DatesJournal of the Operational Research Society, 1982
- Context theory of classification learning.Psychological Review, 1978