Abstract
This article describes the development of the Musgrove Vertical Axis Wind Turbine (VAWT) concept, the UK ‘Carmarthen Bay’ wind turbine test programme, and UK government's wind power programme to 1990. One of the most significant developments in the story of British wind power occurred during the 1970s, 1980s, and 1990s, with the development of the Musgrove vertical axis wind turbine and its inclusion within the UK Government's wind turbine test programme. Evolving from a supervisor's idea for an undergraduate project at Reading University, the Musgrove VAWT was once seen as an able competitor to the horizontal axis wind systems that were also being encouraged at the time by both the UK government and the Central Electricity Generating Board, the then nationalised electricity utility for England and Wales. During the 1980s and 1990s the most developed Musgrove VAWT system, along with three other commercial turbine designs was tested at Carmarthen Bay, South Wales as part of a national wind power test programme. From these developmental tests, operational data was collected and lessons learnt, which were incorporated into subsequent wind power operations.

This publication has 3 references indexed in Scilit: