Continuous CommissioningSM of Building Energy Systems
- 1 August 2003
- journal article
- Published by ASME International in Journal of Solar Energy Engineering
- Vol. 125 (3), 275-281
- https://doi.org/10.1115/1.1592538
Abstract
Continuous Commissioning (CCSM) is an ongoing process to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for existing commercial and institutional buildings and central plant facilities. CC focuses on optimizing/improving overall system control and operations for the building as it is currently utilized and on meeting existing facility needs. Innovative optimal engineering solutions are developed using engineering-based model analysis integrated with scientific field measurement. Integrated approaches are used to implement these solutions to ensure practical local and global system optimization and to ensure persistence of the improved operational schedules. Implementation of the CC process has typically decreased building energy consumption by 20% in well over 100 large buildings where it has been implemented. This paper presents the CC process, the primary CC techniques and measures, and a case study.Keywords
This publication has 9 references indexed in Scilit:
- Optimal Airflow Control of Laboratory Air Handling Unit (LAHU) SystemsJournal of Solar Energy Engineering, 2004
- Introduction to the DOE Continuous Commissioning Guidebook-Maximizing Building Energy Performance and EfficiencyPublished by American Society of Civil Engineers (ASCE) ,2003
- Optimal Outside Airflow Control of Integrated Air Handling Unit System for Large Office BuildingsPublished by ASME International ,2003
- Variable Water Flow Pumping for Central Chilled Water SystemsJournal of Solar Energy Engineering, 2002
- International Performance Measurement and Verification Protocol: Concepts and Options for Determining Energy and Water Savings, Volume IPublished by Office of Scientific and Technical Information (OSTI) ,2001
- The Maximum Potential Energy Savings from Optimizing Cold Deck and Hot Deck Reset Schedules for Dual Duct VAV SystemsJournal of Solar Energy Engineering, 1999
- A Practical Guide for Commissioning Existing BuildingsPublished by Office of Scientific and Technical Information (OSTI) ,1999
- Improving Building Energy System Performance by Continuous CommissioningEnergy Engineering, 1999
- Use of Calibrated HVAC System Models to Optimize System OperationJournal of Solar Energy Engineering, 1998