Quantifying siting difficulty: A case study of US transmission line siting
- 31 January 2007
- journal article
- Published by Elsevier BV in Energy Policy
- Vol. 35 (1), 650-671
- https://doi.org/10.1016/j.enpol.2005.12.026
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Transmission policy in the United StatesUtilities Policy, 2005
- MERCHANT TRANSMISSION INVESTMENT*Journal of Industrial Economics, 2005
- Transmission Market DesignSSRN Electronic Journal, 2003
- Expanding Transmission Capacity: A Proposed Planning ProcessThe Electricity Journal, 2002
- Stimulating New Transmission InvestmentsThe Electricity Journal, 2002
- Canadian Innovations in Siting Hazardous Waste Management FacilitiesEnvironmental Management, 1998
- The Siting Problem of Nimby Facilities: Cost – Benefit Analysis and Auction MechanismsEnvironment and Planning C: Government and Policy, 1998
- The role of compensation in siting hazardous facilitiesJournal of Policy Analysis and Management, 1996
- Siting Noxious Facilities: A Test of the Facility Siting CredoRisk Analysis, 1993
- Small Group Studies of Regulatory Decision-Making for Power-Frequency Electric and Magnetic FieldsRisk Analysis, 1990