Production planning with load dependent lead times: an update of research
- 3 May 2007
- journal article
- Published by Springer Science and Business Media LLC in Annals of Operations Research
- Vol. 153 (1), 297-345
- https://doi.org/10.1007/s10479-007-0173-5
Abstract
No abstract availableThis publication has 82 references indexed in Scilit:
- Tractable Nonlinear Production Planning Models for Semiconductor Wafer Fabrication FacilitiesIEEE Transactions on Semiconductor Manufacturing, 2006
- From fluid relaxations to practical algorithms for job shop scheduling: the makespan objectiveMathematical Programming, 2002
- Inventory Models Involving Lead Time as a Decision VariableJournal of the Operational Research Society, 1994
- Theory and practice of load-oriented manufacturing controlInternational Journal of Production Research, 1988
- Palm Probabilities and Stationary QueuesPublished by Springer Science and Business Media LLC ,1987
- The Structuring of Production Control SystemsInternational Journal of Operations & Production Management, 1986
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem ReductionManagement Science, 1983
- The Effect of Workload Dependent Due-Dates on Job Shop PerformanceManagement Science, 1983
- Hierarchical Production Planning: A Single Stage SystemOperations Research, 1981
- Dynamic Modeling and Control of Congestion-Prone SystemsOperations Research, 1976