Heuristic algorithm for scheduling batch and semi-continuous plants with production deadlines, intermediate storage limitations and equipment changeover costs
- 30 September 1994
- journal article
- Published by Elsevier BV in Computers & Chemical Engineering
- Vol. 18 (9), 859-875
- https://doi.org/10.1016/0098-1354(93)e0018-5
Abstract
No abstract availableKeywords
This publication has 7 references indexed in Scilit:
- An exact parallel algorithm for scheduling when production costs depend on consecutive system statesComputers & Chemical Engineering, 1990
- Short-term scheduling for multiproduct batch chemical plantsComputers & Chemical Engineering, 1986
- Production planning and scheduling for multi-purpose batch chemical plantsComputers & Chemical Engineering, 1979
- Interval estimation of a global optimum for large combinatorial problemsNaval Research Logistics Quarterly, 1979
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a SurveyPublished by Elsevier BV ,1979
- A statistical approach to the tspNetworks, 1977
- Limiting forms of the frequency distribution of the largest or smallest member of a sampleMathematical Proceedings of the Cambridge Philosophical Society, 1928