Field Placement and Evaluation of Stabilized Dredged Material (SDM) from the New York/New Jersey Harbor

Abstract
Since the 1997 local ban on ocean dumping of dredged sediments, the States of New York and New Jersey have pursued a policy of environmentally sound solutions to the management of dredged material, including beneficial use of stabilized dredged material (SDM) in transportation applications. A pilot study was initiated in 1998 to evaluate the use of SDM in the construction of highway embankments. Utilizing 80,000 cubic yards of dredged material, two embankments were constructed from SDM on a commercial development area adjacent to the Harbor. Geotechnical properties and handling of SDM were evaluated both during and one year post − construction. This article presents the evaluation of the embankments themselves, including constructability and performance. The results demonstrate that SDM satisfies most of the geotechnical criteria for fill construction, except those for durability, requiring proper coverage and protection similar to that provided for fills constructed on cohesive soils. This same characteristic precludes long term stockpiling of SDM prior to final placement, limiting applications to those that have schedules overlapping with dredging projects. Increased costs for the use of SDM can be as high as $8 per cubic yard over traditional fills; however, this cost may be recouped through management fees collected from dredging projects.