The relationship of geophysical measurements to engineering and construction parameters in the Straight Creek Tunnel pilot bore, Colorado
- 31 January 1968
- journal article
- Published by Elsevier BV in International Journal of Rock Mechanics and Mining Sciences
- Vol. 5 (1), 1-30
- https://doi.org/10.1016/0148-9062(68)90020-x
Abstract
No abstract availableKeywords
This publication has 1 reference indexed in Scilit: