Scheduling freight trains traveling on complex networks
- 1 August 2011
- journal article
- Published by Elsevier BV in Transportation Research Part B: Methodological
- Vol. 45 (7), 1103-1123
- https://doi.org/10.1016/j.trb.2011.05.021
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- Scheduling extra freight trains on railway networksTransportation Research Part B: Methodological, 2010
- A branch and bound algorithm for scheduling trains in a railway networkEuropean Journal of Operational Research, 2007
- N-tracked railway traffic re-scheduling during disturbancesTransportation Research Part B: Methodological, 2006
- An exact solution procedure to determine the optimal dispatching times for complex rail networksIIE Transactions, 2006
- Modeling train movements through complex rail networksACM Transactions on Modeling and Computer Simulation, 2004
- Optimal scheduling of trains on a single line trackTransportation Research Part B: Methodological, 1996
- A Model, Algorithms and Strategy for Train PathingJournal of the Operational Research Society, 1995
- Real-time scheduling of freight railroadsTransportation Research Part B: Methodological, 1995
- Extending a train pathing model from one-way to two-way trackTransportation Research Part B: Methodological, 1994
- A model and strategy for train pathing with choice of lines, platforms, and routesTransportation Research Part B: Methodological, 1994