Estimating order lead times in hybrid flowshops with different scheduling rules
- 31 May 2009
- journal article
- Published by Elsevier BV in Computers & Industrial Engineering
- Vol. 56 (4), 1668-1674
- https://doi.org/10.1016/j.cie.2008.10.016
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Flexible flow shop scheduling: optimum, heuristics and artificial intelligence solutionsExpert Systems, 2005
- Optimization-Based Available-To-Promise with Multi-Stage Resource AvailabilityAnnals of Operations Research, 2005
- Real-time due-date promising by build-to-order environmentsInternational Journal of Production Research, 2004
- Due-date assignment in wafer fabrication using artificial neural networksThe International Journal of Advanced Manufacturing Technology, 2004
- An immune algorithm approach to the scheduling of a flexible PCB flow shopThe International Journal of Advanced Manufacturing Technology, 2003
- A survey of the state-of-the-art of common due date assignment and scheduling researchEuropean Journal of Operational Research, 2002
- A Simple, Robust Leadtime-Quoting PolicyManufacturing & Service Operations Management, 2001
- Optimal Lead Time PoliciesManagement Science, 1999
- Estimating flowtimes and setting due-dates in complex production systemsIIE Transactions, 1995
- Survey of scheduling research involving due date determination decisionsEuropean Journal of Operational Research, 1989