Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties
- 1 October 2009
- journal article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 198 (1), 173-189
- https://doi.org/10.1016/j.ejor.2008.09.001
Abstract
No abstract availableThis publication has 21 references indexed in Scilit:
- Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost saleEuropean Journal of Operational Research, 2007
- Maintenance scheduling and production control of multiple-machine manufacturing systemsComputers & Industrial Engineering, 2005
- The elixir of life: using a maintenance, repair and replacement model based on virtual and operating age in the water industryIMA Journal of Management Mathematics, 2004
- Hierarchical control of production and maintenance rates in manufacturing systemsJournal of Quality in Maintenance Engineering, 2003
- Production/maintenance cooperative scheduling using multi-agents and fuzzy logicInternational Journal of Production Research, 2002
- Production and preventive maintenance rates control for a manufacturing system: An experimental design approachInternational Journal of Production Economics, 2000
- Hedging Point Policy ImprovementJournal of Optimization Theory and Applications, 1998
- Manufacturing flow control and preventing maintenance: a stochastic control approachIEEE Transactions on Automatic Control, 1990
- Some results for repairable systems with general repairJournal of Applied Probability, 1989
- Analytical Evaluation of Hierarchical Planning SystemsOperations Research, 1981