Peak-load management in steel plants
- 31 May 2006
- journal article
- Published by Elsevier BV in Applied Energy
- Vol. 83 (5), 413-424
- https://doi.org/10.1016/j.apenergy.2005.05.002
Abstract
No abstract availableKeywords
This publication has 7 references indexed in Scilit:
- Dynamic modelling and scheduling of an industrial batch systemComputers & Chemical Engineering, 2002
- Constraint-Based Resource Allocation and Scheduling in Steel ManufacturingLecture Notes in Computer Science, 1998
- A simple continuous-time process scheduling formulation and a novel solution algorithmComputers & Chemical Engineering, 1996
- Peak utility load reduction in batch processes operated periodically and under uncertaintyComputers & Chemical Engineering, 1996
- Optimal scheduling of cyclic batch processes for heat integration—I. Basic formulationComputers & Chemical Engineering, 1995
- Response of large industrial customers to electricity pricing by voluntary time-of-use in TaiwanIEE Proceedings - Generation, Transmission and Distribution, 1995
- Hierarchical production planning for a modern steel manufacturing systemInternational Journal of Production Research, 1989