Stochastically minimizing total flowtime in flowshops with no waiting space
- 16 February 1999
- journal article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 113 (1), 101-112
- https://doi.org/10.1016/s0377-2217(97)00438-4
Abstract
No abstract availableThis publication has 19 references indexed in Scilit:
- Scheduling in stochastic flowshops with independent setup, processing and removal timesComputers & Operations Research, 1997
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum latenessComputers & Operations Research, 1996
- A note on minimizing the expected makespan in flowshops subject to breakdownsNaval Research Logistics (NRL), 1995
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic BreakdownsJournal of the Operational Research Society, 1995
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective functionEuropean Journal of Operational Research, 1995
- Scheduling onM parallel machines subject to random breakdowns to minimize expected mean flow timeNaval Research Logistics (NRL), 1994
- Two-machine ordered flowshop scheduling under random breakdownsMathematical and Computer Modelling, 1994
- Single-machine scheduling subject to stochastic breakdownsNaval Research Logistics (NRL), 1990
- Stochastically minimizing the makespan in flow shopsNaval Research Logistics Quarterly, 1984
- Flowshop/no-idle or no-wait scheduling to minimize the sum of completion timesNaval Research Logistics Quarterly, 1982