Approximate Calculation of Optimal Inspection Times

Abstract
This paper considers an inspection model whose failure is known only through checking. A new approximate calculation of optimal checking procedures is suggested. This computes successive check times backwards, supposing that an appropriate check time is previously given after a large number of checks. This policy is simple to compute and compares fairly well with the optimal policy.