Dynamic task assignment for throughput maximization with worksharing
- 1 February 2006
- journal article
- Published by Elsevier BV in European Journal of Operational Research
- Vol. 168 (3), 853-869
- https://doi.org/10.1016/j.ejor.2004.07.033
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Factors affecting opportunity of worksharing as a dynamic line balancing mechanismIIE Transactions, 2002
- Management of Worksharing SystemsManufacturing & Service Operations Management, 2000
- Characterizing the optimal allocation of storage space in production line systems with variable processing timesIIE Transactions, 2000
- A general framework for comparing operating policies in manufacturing cellsAnnals of Operations Research, 1998
- Performance of a Manufacturing Module with Moving WorkersIIE Transactions, 1996
- A Production Line that Balances ItselfOperations Research, 1996
- A comparison of scheduling philosophies for manufacturing cellsEuropean Journal of Operational Research, 1993
- “On-the-fly” line balancing with very little WIPInternational Journal of Production Economics, 1992
- The Role of Work-in-Process Inventory in Serial Production LinesOperations Research, 1988
- The production rate of a series of work stations with variable service times∗International Journal of Production Research, 1973