Surface-Flow Constructed Treatment Wetlands for Pollutant Removal: Applications and Perspectives
- 31 May 2011
- journal article
- review article
- Published by Springer Science and Business Media LLC in Wetlands
- Vol. 31 (4), 805-814
- https://doi.org/10.1007/s13157-011-0186-3
Abstract
No abstract availableKeywords
This publication has 61 references indexed in Scilit:
- Effectiveness of a Full-Scale Constructed Wetland for the Removal of Metals from Domestic WastewaterWater, Air, & Soil Pollution, 2009
- What can we learn from old wetlands? Lessons that have been learned and some that may have been forgotten over the past 20 yearsDesalination, 2009
- The universal design, operation and maintenance guidelines for farm constructed wetlands (FCW) in temperate climatesBioresource Technology, 2008
- Iron and manganese removal in wetland treatment systems: Rates, processes and implications for managementScience of The Total Environment, 2008
- Decomposition of macrophyte litter in a subtropical constructed wetland in south Florida (USA)Ecological Engineering, 2006
- History and description of the Everglades Nutrient Removal Project, a subtropical constructed wetland in south Florida (USA)Ecological Engineering, 2006
- Nutrient removal and bio-energy production from Netley-Libau Marsh at Lake Winnipeg through annual biomass harvestingBiomass and Bioenergy, 2006
- Mechanisms for Organic Matter and Phosphorus Burial in Sedimentsof a Shallow, Subtropical, Macrophyte-Dominated LakeJournal of Paleolimnology, 2006
- Determination of 56 Trace Elements in Three Aquifer- Type Rocks by ICP-MS and Approximation of the Relative Solubilities for These Elements in a Carbonate System by Water-Rock Concentration RatiosPublished by Springer Science and Business Media LLC ,2005
- Functions of Macrophytes in Constructed WetlandsWater Science & Technology, 1994