Modeling realistic hybrid flexible flowshop scheduling problems
- 30 April 2008
- journal article
- Published by Elsevier BV in Computers & Operations Research
- Vol. 35 (4), 1151-1175
- https://doi.org/10.1016/j.cor.2006.07.014
Abstract
No abstract availableThis publication has 38 references indexed in Scilit:
- PRACTICE‐FOCUSED RESEARCH ISSUES FOR SCHEDULING SYSTEMS*Production and Operations Management, 2002
- Hybrid flow shop scheduling: A surveyComputers & Industrial Engineering, 1999
- Les problèmes d'ordonnancement de type flow-shop hybride : état de l'artRairo-Operations Research, 1999
- Operations Research Techniques in Manufacturing Planning and Control SystemsInternational Transactions in Operational Research, 1995
- Addressing the gap in scheduling research: a review of optimization and heuristic methods in production schedulingInternational Journal of Production Research, 1993
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983
- An Exploratory Technique for Investigating Large Quantities of Categorical DataJournal of the Royal Statistical Society Series C: Applied Statistics, 1980
- Problems in the Analysis of Survey Data, and a ProposalJournal of the American Statistical Association, 1963
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954